Road Closures and Construction Notices
Search
Notice of Works – Seven Meadows (Marydel Homes) Subdivision
Posted on Friday, May 16, 2025 04:06 PM
Please be advised that starting the week of May 20, the developer (Marydel Homes) will be undertaking some works within the Seven Meadows subdivision in Beaverton. These works are anticipated to take place over a number of weeks and will include grading and sodding the central park block, fencing, walkways, street sweeping, and flushing underground services and catchbasins, among other work. These works are required to be completed before the Township will assume this subdivision.
All works will...

Lane Restrictions on Regional Road 13, April 7, 2025
Posted on Monday, April 07, 2025 03:27 PM
The Regional Municipality of Durham will continue road reconstruction of Regional Road 13 from 730 metres east of Lake Ridge Road (Regional Road 23) to 810 metres west of Sideroad 17. The work includes grading, drainage, curb and gutter, hot mix asphalt, sod and seed, and new plantings.
Construction Schedule
The Region’s contractor, Dufferin Construction Company, will be mobilizing the week of April 21. Work is anticipated to be completed in its entirety by mid-June. Unfavorable weather...

Sunderland Maple Syrup Festival – A Sweet Tradition 2025
Posted on Wednesday, March 26, 2025 10:34 AM
The 28th Sunderland Maple Syrup festival opens to families on April 5 & 6 from 9:00a.m.-4:00p.m. right in the heart of Sunderland with an outdoor vendor’s market on River Street and Church Street. Here you can find baked goods, local artisans, entertainment, tours and of course MAPLE SYRUP.
The festival is biggest event in Brock that welcomes over 10,000 visitors each year and is a celebration you won’t want to miss, with something for everyone to enjoy.
Please note, for safety and to accommodate...

Road Closures: Flooding Response March 18, 2025
Posted on Tuesday, March 18, 2025 09:42 AM
Brock Concession 7 east of Ridge Road to 18 A is temporarily closed due to flooding.
Brock Concession 13 from Lloyd Sideroad to Side Road 17 is temporarily closed due to flooding.
Graders are working on Sideroad 18 and 17 fixing the worst areas with some gravel. Please use extreme caution if driving in this area.

March 6, 2025 - Snow Removal Update
Posted on Thursday, March 06, 2025 09:07 AM
In addition to regular winter operations, staff are continuing with the removal of excess snow in Beaverton.
Thank you again to all residents for your ongoing patience, together, we will continue to navigate these challenges and work towards a safer, more resilient community.